TatinAndCo Delivery Scheduler for WooCommerce Review: A Speed Score That Holds Up

TatinAndCo Delivery Scheduler for WooCommerce - MakeWPFast

TatinAndCo Delivery Scheduler for WooCommerce is a WordPress plugin. Adds a delivery date and time picker to the WooCommerce checkout page. My 3-context benchmark shows it barely registers (-11ms TTFB on activation).

A
Measured Speed Score
How is this scored?

My Benchmark Methodology

Every speed score on MakeWPFast is based on real performance measurements, not estimates. I install each plugin on a clean WordPress 6.9 setup (PHP 8.3, MariaDB, GeneratePress theme) and measure two key metrics:

PHP Memory Usage — how much additional memory the plugin consumes per request. Each doubling of memory overhead costs 10 points. High memory usage can cause crashes on shared hosting and limits how many plugins you can safely run together.

Database Queries — how many extra SQL queries the plugin runs per page load. Each 10x increase in query overhead costs 25 points. More queries mean more database work, slower pages, and harder scaling.

The score uses a logarithmic scale — the first few extra queries or megabytes matter more than going from 100 to 110 queries. This reflects real-world impact: the jump from 4 to 14 queries is far more noticeable than 100 to 110.

GradeScoreWhat it means
A90–100Negligible impact. Safe to install on any hosting.
A-80–89Very light impact. Minimal overhead on any setup.
B+ / B / B-65–79Light impact. Adds some overhead but manageable on most setups.
C+ / C / C-50–64Moderate impact. May noticeably slow down budget hosting.
D+ / D35–49Heavy impact. Will affect page load times. Consider alternatives.
F0–34Severe impact. Significant resource usage that hurts performance.

Plugins marked "Not Yet Tested" have not been benchmarked yet. I do not estimate or guess scores — if there is no measured data, there is no grade.

Note: Benchmarks measure a plugin in isolation on a clean install. Real-world impact varies based on your hosting, other plugins, and how the plugin is configured.

Performance Benchmark
Tested May 2026 · How I test
ContextTTFBMemoryQueries
Activation+-11 ms+0 MB+0
🏠Homepage+0 ms+0 MB+0
⚙️WP Admin+-4 ms+0 MB+0
Low impact
Think this score looks wrong?
Plugin Overview
Tested Up ToWP 7.0.2
Requires PHP7.4+
Last UpdatedMay 21, 2026
Downloads45
AuthorJmarc

Show the measurement

I benchmarked TatinAndCo Delivery Scheduler for WooCommerce and it adds no measurable time to a homepage load. "Does this plugin slow my site?" is a question you probably field a lot — this answers it with a number somebody else measured.

<a href="https://makewpfast.com/plugins/tatinandco-delivery-scheduler-for-woocommerce/"><img src="https://makewpfast.com/wp-json/mwf-pseo/v1/badge/tatinandco-delivery-scheduler-for-woocommerce" alt="TatinAndCo Delivery Scheduler for WooCommerce performance impact, independently measured by MakeWPFast" /></a>

Preview:

TatinAndCo Delivery Scheduler for WooCommerce performance impact, independently measured by MakeWPFast

Paste it in your README or on your site. The badge reads live from my benchmarks, so it stays current on its own — including if a future release changes the number. How I measure.

Performance Analysis

Performance Impact

Our real benchmark tests measured the following impact when activating TatinAndCo Delivery Scheduler for WooCommerce:

  • TTFB impact: +-11 ms
  • Memory impact: +0.0 MB
  • Additional DB queries: +0

Overall activation impact: low. This plugin adds minimal overhead to your WordPress site.

Maintenance Status

Last updated: 2026-05-21. Requires PHP 7.4+.

Benchmark data measured in an isolated Docker environment (WordPress 6.8, PHP 8.3, GeneratePress). See our full methodology.

Find slow plugins on your own site

WP Multitool scans your WordPress site for slow queries, memory hogs, and performance bottlenecks - in one click.

Try WP Multitool →
🔍

Want a real human to dig into your specific site?

I offer a WordPress performance audit - slow queries, plugin overhead, autoload bloat. Written report, prioritized fix list. $299 flat, 48h turnaround.

See details →

Alternatives to TatinAndCo Delivery Scheduler for WooCommerce

PluginSpeed ScoreActive Installs
WooCommerceD7M+
Ultimate Addons for ElementorA2M+
Google for WooCommerceB+800K+
Get WordPress Performance Tips

Plugin reviews, speed optimization guides, and error debugging — straight to your inbox.

No spam. Unsubscribe anytime. I respect your privacy.